Shaping Europe’s energy future: sharing our strategic vision with the European Commission
Our CTO Bruno Luscan was recently invited to participate in a workshop to discuss the needs and deployment of carbon neutral power systems.
Our CTO Bruno Luscan was recently invited to participate in a workshop to discuss the needs and deployment of carbon neutral power systems.
Sébastien Silvant reçoit le Prix IEEE PES de l'ingénieur de l'année 2024 pour son travail sur l’interopérabilité des réseaux HVDC.
Presenting OpTEAsoft Wind, our new simulation software for optimising the design of your inter-array architectures based on your KPIs.
This thesis studies the opportunities for improving the stability of hybrid AC and DC networks by means of active power control.
The READY4DC project concluded, laying essential foundations for the development of Europe’s first multi-terminal, multi-vendor HVDC project.
Dans le cadre du projet OPHELIA, SuperGrid Institute aura notamment la responsabilité de fournir des transformateurs électroniques DC pour le démonstrateur.
The Alpha phase of the Network DC project has successfully come to an end and SuperGrid Institute are getting stuck into the Beta phase.
This paper addresses several key DC grid control functional requirements.
A methodology to define functional requirements and parameter ranges for HVDC building blocks such as converters and switching stations based on Simplistic Test Benchmarks (STB).
In order to decarbonize the European electricity production, the European Commission set an ambitious target of 300 GW of offshore wind capacity by 2050.