Case study of dc-MMC interconnecting two HVDC lines with different grid topologies
This paper presents a case study of a non-isolated dc-dc converter interconnecting the NordLink and Cobra cable projects.
This paper presents a case study of a non-isolated dc-dc converter interconnecting the NordLink and Cobra cable projects.
The objectives of the thesis is to identify the main challenges of applying fully selective FCS in HVDC grid.
SuperGrid Institute is committed to transforming industry and protecting the environment by signing the Greater Lyon manifesto.
Hydro power plants can be the most prominent solution as they are both renewable & capable of following the load demand by controlling its output.